Project: EaglesWing     -     Entry

Sep 11, 2022 3.8 L/H & R/H Flaperons Category: Slats/Flaps
Cleco the L/H flaperon ribs, L angle, and hinge brackets to the spar. Installed #5 solid AD rivets. Slid the skeleton into the skin, cleco the top side and installed A4 rivets to the top side of the L/H outboard flaperon. Pulled the nose skin over and cleco the skin to the spar. Also on the R/H outboard flaperon pulled the nose skin over and cleco the skin to the spar.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.