Project: EaglesWing     -     Entry

Oct 01, 2022 2.2 Slats Category: Slats/Flaps
Laid out all the slat pieces.
Sanded the edges and de-burred the holes on the 10 slat pickup (SD75S1-4) pieces. Scuffed for priming.
Drilled the 18 slat ribs flange holes to a # 30.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.