One of the holes on the slat ribs where the slat pickups attach needed to be drilled to a #21. Reamed up to size. De-burred all holes and rounded the corners on the slat ribs. De-burred holes and sanded the edges of the slat corner doublers. Scuffed the slat ribs and corner doublers with 3m red scotchbrite.