EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
EaglesWing
- Entry
Date:
Aug 27, 2023
Hours:
2.2
R/H Wing
Category: Wings
Description:
Drilled the 8 holes for the AN3 bolts to a #12 in the spar and nose ribs. Kept going up one size at a time to keep the holes straight. Cleco and installed A5 rivets on the stiffeners to the tank inboard and outboard ribs.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.