Title: Drilled and clecoed the skin to the vertical stabilizer frame
Drilled and clecoed the skin to the vertical stabilizer frame. Removed and deburred all parts. Removed the plastic from the back of the skin and on the front from around the rivet holes. Sprayed the parts with the 2 part epoxy primer.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.