Title: ADAHRS bracket
Fabbed another spacer to the z angles to increase the room at the rear of the ADAHRS bracket for the SV connector. Match drilled the new spacers, deburred and primed the left side. Also added a split fuel line to prevent chafing of the SV cable by the edge of the F-407 bulkhead. Not sure if this will be the final design, but is ok for now.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.