Removed subpanel rib F-745R to aid in the installation of nutplates. Drilled, deburred and dimpled for nutplates to secure the the ElectroAir EIS controller on the subpanel rib. Worked on placement of the corrugated tubing up the firewall from the sit of the tunnel cover F-782C to prevent chafing.