Installed the remaining EGT/CHT connectors to the SV-EMS-220 harness wires. Used my multimeter to verify the connection of all the connectors to the SV-EMS-220 dsub connector. Added some service loops and may have gone a little overboard, but I can always reduce the extra wire later. Now I just need to clean things up and secure the extra wire.