Title: Right wing fuel tank and QB inspection
Filled stall holes in the leading edge of the right wing (thought only left, was surprised to find these holes in the right wing too) with micro. I also found that the VA-146 bearing and inboard nutplates were not done, although the sections are marked as completed by the Quick builders. Removed and inspected the fuel tank. Installed the fuel return fitting and level sender and leak checked. I snooped the snot out of the tanks and didn't see any bubbles and the balloon held for a few hours without issue. Ready to reinstall the tank. The rest of the wing looks good and ready for wire, controls and skin.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.