Ran CAN bus to all LRU's. Wired the alternators, finished installation of VP-X Pro. Installed heater boxes and controls. Labeled the panel and started installing switches. Installed the oil damper control. Wired the VR's. Installed instrument hoses for static, AOA and pitot.