Title: Fuselage, Baggage area, door and floorboards
This is essentially a catch up entry for my ongoing work. I'm about ready to start installing the cabin cover. I did customize my baggage door to install a magnetic reed switch to provide a "door open" alert on the G3X, along with the two main cabin doors. Doing the forward rivets on the front floorboards was a physical challenge for this large human being, but I got through it.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.