Title: Left Wing Final Inspection and Riveting.
Double checked all my work on the left wing to make sure i didnt forget anything and then spent the next few hours installing approximately 700 rivets. The only items not riveted are the tip rib as i want to paint that item and the root doubler as that does not get riveted until the wings are installed and rigged.