Title: Right Wing Deburring Pt.2 and Leading Edge Prep
Removed Pitot Tube for rivet prep, Deburred the Lower Leading Edge Ribs, and the Leading Edge Skin, Then Dimpled Both, After That deburred the lower aft ribs and the Aft Wing Skin, Finally reinstalled the aft Skin and half of the leading edge skin in prep for Riveting.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.