Title: Section 39
Finished Section 39 today. Squared up the Control Sticks and installed the Elevator Pushrod Assembly. Had to make a small jig to set the correct length of the forward Pushrod while in the neutral position and also using the Elevator Bellcrank jig. Also had to make sure the loop in the safety wire goes aroung the bearing, passing between the rod end housing and the WD-1010 Control Column clevis and is captured by the AN4 bolt


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.