Title: Installed stick linkage, gussets, fwd floors
Had to tape a couple of wrenches together to get the nuts started on the lower bolts, but decided that at this point there was no reason not to install the control stick assy. Also installed the gussets just fwd of the spar in preparation for the fwd covers. Installed some nut plates etc. and temporarily installed the fwd floor. & prepped the center tunnel cover & heat diffuser.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.