Some of the fuel line fittings were just finger tight as I positioned and finalized routings and wiring and so forth, so after I finish the fuel vent tank to fuselage plumbing I went back and put a wrench on every fitting to confirm that they were all tight. as I checked each one, I put a stripe of torque putty at that location to signify that it was tightened.