Title: Step #75 - Install Fuel tanks and rivet root ribs
I never pressure tested my tanks so I spent the afternoon testing all four tank. Both Aux tanks has two minor pin hole on the top of the tank. Repaired with JB Weld Removed wing from jig. Removed uprights from the jig so I can start the wing lay down steps. Did I mention how good it feels knowing I'm done putting the wings back in the jig? Its a good milestone.