Title: Avionics Wiring
Great week of solid work wiring the panel. I was able to get in the flow and make great progress and I'm happy to report that ALL LRU's have been wired with their CANBUS, RS232 wires in addition to various other connections. This weekend I spent much of it troubleshooting a few devices that were not communicating correctly (GSA28, GEA24). I had three wires that needed to be switched and one bad crimp on a PWR wire to the GSA28. Otherwise, after I worked through the configuration process via the G3x manual, everything is communicating now with the exception of the GAD27 and the NAV 1 on the GNC255. I've spent hours trying to figure them out but finally stopped and sent an email to G3xpert for assistance. I have plenty to move forward on such as the lighting bus and wiring the GMA245 heard set / PTT switches in the control sticks. Excellent week of progress and I'm looking forward to another productive week.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.