Title: Avionics - continued
I took about 1.5 weeks off from the build so I could run a race and visit family in KCMO. It was a nice break but missed building! Since my last post in June I've completed the following: - Configured G3X system along with all other devices - Mounted panel permanently - Fitted glare shield - located and ran all wiring to antenna's (except ones that will be mounted on wing) - Wired all headset and mics (crossover console) - Ran wiring for battery charge system w/n cockpit - Connected autopilot cables to capstans (need to wait to tighten cables prior to final adjustments) - wired XFER pump discrete to G3x - Finished connecting static and pitot lines to avionics - ordered throttle, prop, and throttle cables from McFarland - mounted ELT system - mount fresh air vents (sure wish I had mounted these PRIOR to install the firewall!


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.