Title: Weight and Balance - take 2
Drained all the fuel from the wings and headers so no fuel was in the plane other than what was in the fuel lines. Put the MLG spaced under the weights instead of on top. Made sure the plane was leveled to the proper waterline measurement. The weights came out much better than last time and the NLG weight is more in alignment with what the factory was looking for.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.