Title: Aileron control cable routing
Control column connection to aileron cables. Locating the pulleys at the base of the column was not obvious to me, but as soon as it was placed, the routing became obvious. I will use yellow mason line to visualize the route for the cables, through the landing gear box, out to the sides of the fuselage and to the lower aileron bellcrank that will move the aileron control rod to push the upper aileron bellcrank.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.