Title: Elevator
Final drilling to A4 for a few remaing holes. Needed angle drill. Disassemble for deburring. Drilled out nose rib for electrical wire grommet. Cylinder hold down clamps fabricated. Received DMC crimper.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.