Wing was a lot easier the second time; should be done with this wing soon. The deeper consideration, basic learning, tool and part acquisition was on the first wing. This one is all about refinement and getting better at doing something the second time through.
Installed fuel sender with appropriate aviation grade sealant.
Wired according to plans and crimped according to 43.13-1b.