Here is a summary of work in progress and completed along with punch list items: Firewall Forward Cowling is nearing completion. In last week, finished flox and sanding around air inlets, and installed last of baffle seal on right side only. Fabricated and installed new aft top cowling hinge pins. All that remains is: - installation of foam seal around prop gov. - installation of heat shielding to inside top cowling - any modification to lower cowling to accommodate controls Fuel Controller will be picked up from Airflow next week and re-installed along with the alt air and all controls the week of June 13. That will complete these mods. Vans should be shipping the back-ordered parts to complete installation of the oil cooler ducting so I expect to complete that the week of June 13 as well. Ordered the a/c v-belt recommended by John and should arrive next week. Will have to pull prop. I may have to order alternate size if this one isn't correct. Other FWF items to complete include: - installing firewall seal on all penetrations - install bulkhead fitting and connect hoses to a/c - run power to a/c compressor Cockpit and Cabin Classic Aero interior is due mid-July. Thing to get done before that include: - Install the new toe brakes and foot pedals and connect to rudder cables - Install heater vent cables (part of back-ordered parts) - Install aileron control links - connect refrigerant lines to bulkhead fittings - run a/c wiring to aft of baggage bulkhead - install flap position switch - install antennas including coax - run AoA and pitot tubing


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.