Title: Starting on the right elevator
Just some quick work to get going on the elevators. Plans have you start with the right side. You start by cutting to length all of the stiffeners for both the left and right elevators. You end up with two sets that are not identical as the left elevator structure now slightly different to accommodate the trim tab. Stiffeners cut and separated. I will leave the vinyl on the left side set so as not to confuse the two sets. Spent the rest of my short time trimming a few of the stiffeners on the band saw and cleaning/deburring them on the scotchbrite wheel. Same exact process as was done for the rudder. Gotta watch the edge distance on the front holes, very easy to buff too much material off.