Title: Prepped remaining forward floor
Second verse, same as the first . I did realize that three rivets on the mixture bracket should've been riveted before the skin was riveted on (there was no point in the instructions were it said to definitely rivet them) and it was a little tough getting the clecos out becsuse the floor had been riveted on, but I schemed to get it down. Rivets wouldn't go in so Brad Benson is bringing over a right angle drill in a day or so.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.