Title: Prepped G3X brackets
I finished riveting the doubler to the instrument panel flange (I really should work on the second one but that's in a different section) and then dug out various brackets needed for the fireall. This mostly consisted of cutting to separate and filing/deburring, countersinking, and attaching nutplates. This included the firewall bracket, the transponder bracket and the F-00054 brackets. I've decided not to replace the center console. Too much can go wrong detaching the various cables and it looks fine as is.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.