Title: Installed Brake Line Straws to Legs
Prepared main gear legs for attachment of straws to hold the brake line. Sanded, glued and glassed the straws to both legs. Began to install the flanges to hold the instrument panel and received side sticks to install after panel is leveled.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.