Title: Fuel Strakes
Cleaned the two front shelf bulkheads and sanded areas inside fuselage to install the fuel gauge and fuel vents on both sides. Measures and cut holes for both. Sanded and cleaned shelf window areas in prep to install 1/8��windows.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.