Title: Initial Fence Baffle System Installation
Installation and fit-up of the AeroVee cooling baffle system, began with rear left and right fence progressing around right side. Opening for oil return pass through needs increased opening to not interfere with fence positioning. Will need some sort of grommet to seal tubing to fence. Research revealed that the lower sheet metal supplied by Sonex is not required for a top mounted cooler.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.