Bonded lower side ribs, shrunk fabric at 250F, applied reinforcement tapes,, installed rivets, securing fabric to ribs, shrunk at 300F, Applied gussets and fabric dollies over bracket areas, chordwise tapes over ribs top and bottom sides using the polyfiber system instruction.