Title: Avionics access door and aft baggage mod
1. Continued fabricating new avionics door. Cut, filed and sanded edges to match old door. Cut, located, drilled and clecoed new door hinge. 2. Decided to install nutplates in all parts of aft baggage floors, so ALL of it can easily be removed if needed for maintenance, inspections, etc., including the floor and side panels. (Originally, these would have been blind-riveted in place.) Clecoed side panels to floor panel in preparation for drilling.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.