Title: Instrument panel racks; EFIS attach ring
1. Drilled the rivet holes for the EFIS attach ring. 2. Drilled and grommeted some new holes for wiring to pass through the gear tower. 3. Continued fabricating the side pieces for the instrument panel avionics racks.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.