This evening, I riveted the smoke-oil reservoir doubler plate and nutplates to the aft baggage floor, and attached the attach angles with 1/4" bolts. Then I countersunk the holes under the reservoir that will take flush blind rivets, attaching the floor to the longerons. With the exception of painting, the floor is basically ready to install.