Title: Gear leg priming and hardware assembly
Today I test-fit the wheel/brake hardware onto the right gear leg, similar to the left leg. Then I removed the brakes and wheels, and prepped and primed the gear legs. After they dried, I reinstalled everything. The gear legs are just about ready to bolt onto the fuselage. I still have to install some AN fittings on the brake housings, and torque and safety a couple of bolts, and they'll be ready to go.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.