Title: Odds and ends
Cleaned up garage, applied anti seize to EGT probes and tightened into exhaust. Installed site tubes for fuel tank level along with split plates to hold fuel level placard. Assembled fuel shut off valves for each tank, cut and installed short section of fuel line between wing and probable area of fuel valve installation. Applied Velcro sticky tape to foot wells for cockpit trim. Cleaned barbs on fuel header tank