Title: Taxi tests and engine runups
Multiple days at hangar to finalize install of floor boards, carpet, seat belts, fix coolant leak, engine run up, adjust prop pitch settings to obtain desired static rpm, brake break-in, taxi tests to learn braking with castering nose wheel is different.