Title: 29-20 Fuse Side Skins step 1 left and rightfloor panel
Installed the floor panels (left and right) with significant effort in bending the panels into the right positions. Riveted with pull rivets the left panel. Used some paper to protect the paint.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.