Title: 39-9 Control System: PRELIMINARY INSTALLATION
Installed hardware and all the parts according to the different instructions in section 39 in order to check for movement and potential interference with other systems / structure. I also verified alignment of the two controls stick using a small rig to check sticks are parallel. result seems to be ok. Pending verification with Lucio and final installation (after final installation of fuel tubing and brake tubing.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.