Title: layout and mock up for LRU's
cut mock up of the different LRU's out of styrofoam. Tentative layout of instrument panel including two analog instruments (winter 57MM). Need to cut the sub panel to allow for the gn255 connectors. Possible use of remote transponder GTR45R (position in the back of the fuselage (battery area).


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.