EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Title: FF1_10 Engine Installation
Installed the firewall passthrough. Reinstalled one of the shunt as it was mounted upside down. Checked firmness of all components. Installed the steel shield for the air control cables. Installed all the screws in the eyeballs passthrough.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.