Installed gascolator, the stem mount had been done for some time but I had left the gascolator safe in its box until ready. Used a strap to physically pull the engine crate/box out into the middle of the hangar to allow removal of packaging. Removed plastic bag that had been sealing the engine and began to prepare for work on cooling baffles, fittings and related before hanging the engine. Also noted that the Lightspeed ignition pick up sensor mounts and magnet ring had already been mounted on the engine at the factory. Always glad to have some time saved for me!