Continued with seat installation. Wet riveted roller rails. Also installed spacer tubes.
Fabricated a pressure pot from an old oil can by soldering a 1/8 NPT Shrader valve to the pot and sealing the cap with a rivet and proseal.
Primered brake lines and gear leg slot.