Title: L Wing Attachment
Attached left wing, with assistance from Rob. Draped hinges with rags to help prevent cranial damage. Includes 2.0 hrs for Rob. Also used cyanoacrylate glue to tack VS bottom edge moulding in place. Ensured the moulding is pressed as far up as possible before tacking it with the glue— installing the VS is easier that way! Just tacked it in a few places— the moulding is captured when the VS is bolted in place.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.