Completed rigging of ailerons and flaps, except for final torquing of fasteners. Binding of right aileron was found to be a rod-end bearing that required lubrication. Using LPS-2, lubricated all of the bearings in the flaps and aileron linkages, plush the hinge bushings. Cut gap seal on left wing to allow bolt tail on flap clevis to clear.