Title: Cowling
Now that the lower cowling is in place I began the layout of the flanges that will attach the upper cowling to the lower. The layout included identifying where each flange needed to be trimmed to acquire the correct distance between the fasteners, developing the rivet pattern for attaching the flanges to the lower cowling and identifying the need for longer rivets were the flanges overlap. Not a big deal but necessary to do this correctly.