Title: Wings on and wired
Quite a bit has happened since moving to the airport. Got the wings on, took about 3 hours. Surprisingly easy to do. Using dry ice to reduce the bolts diameters helped get them in and with every bolt it seemed to get a little easier. Once I got the wings on I started to connect the rest of the wiring harnesses. Starting from the back and then to the front I made sure everything worked. The wing root had a lot of mismatched wires and so I was grateful that I labeled all the wires making it easier to piece together the puzzle of “what wire goes where”. After several days of working 2 or 3 hours I powered Jt all up and checked all my connections. Everything worked perfectly except the flap motor is backwards, so I just need to reverse those pins.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.