Title: Worked on multiple sections
Left Wing (Holden Glass): Went forward and looked ahead at the plans (fuselage and wings). Started looking at potential issues we could have in future steps. Right Wing (Maggie Colwell): Did machine countersinking on a part. Fuselage 1 (Josh Weiss): We got a piece ready to attach to the bulkhead. We worked on the fuselage floor. Fuselage 2 (Rebecca Colwell): We drilled and riveted on parts on the bulkhead. We had a mix up with the nut plates and we had to bend the part around to get the nutplate in. Wing Ribs (Harsh Patel): We snipped and deburred 28 nose rib pieces. The band saws were not equipped with proper saw blades, so we had to use shears. It was a lot harder and less perfect, but it was what we had. Larry Sullivan: We are getting the parts in the fuselage ready. Once we are ready to connect to them we will really start building a large section of the plane.