Title: Worked on multiple parts
Sunday meetings will now start at 4 pm and go to 8 pm. Fuselage (Rebecca Colwell): We worked on prepping the ribs for the fuselage. We got all the hardware and parts riveted on to the 8 ribs. These will be attached to the lower section of the fuselage. Fuselage 2 (Josh Weiss): We resumed work on the part where we were waiting for the back ordered parts. We riveted a bunch of pieces to the firewall. Wings (Holden Glass + Maggie Colwell): We finished riveting the main skins on the left wing. We started working on the wing walk doubler which is where your feet will go when you get on to the cockpit. We just have to prime the mating surfaces between the wing walk doubler and the surfaces. I(Holden Glass) started working on the lighting part. If you use a normal drill bit on the plexy glass, it would just ruin it. I got the correct drill bit to drill this substance. Mentors: We had a journalist from the Milwaukee Sentinel. We are also going to recieve the finishing kits soon. Richard and I fitted the bulkhead onto the empennage. We were thinking that over the summer, we could schedule 20 - 24 hours and have 3 - 4 people at a time. We can't have 12 people on a single put together fuselage. Smaller groups will work better. We also had a veteran 3 time plane builder Barry Burnstein. He has built 2 rv 12 so far. The professional looking photos are from the journalist.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.