Title: Worked on multiple parts
Fuselage (Rebecca Colwell): We riveted the nutplates on the seat pan assembly, left and right sides. We attached this assembly to the main fuselage piece. We also found that some rivets that were specified in the plans were too short. So we used a size that was .5 larger. Wings (Maggie Colwell): Riveted 2 spots were forgot to rivet a few months ago. We cleaned the bins and stuff. Lighting (Holden Glass): Worked with the lens attachment brackets. I worked on getting ready to get the lens down to final shape. I will use the pneumatic dremel to trim it down. Mentors (John Semenke): They gave us this metal L shape piece. Then vans gave us the metal part and told us to cut a diagnol. However they didn't give any dimensions to cut it. We later found out that they did this to reduce the weight of the fuel injected engine. The original carbureted engine was lighter, so they had to modify it a little in order to have the same weight. Mentor (Wayne Wendorf): Showed how to measure AN bolts and talked a little bit about them. Harsh Patel: Congrats on the popularity of this page! We are getting over 40 views per week! This is great and we hope to inspire more schools to do a program like this.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.